Abstract:
The Aceh earthquake and tsunami that occurred on December 26, 2004 caused enormous losses, including in the sector of road infrastructure. The United States Agency for International Development (USAID) was one of the donor agencies that rebuilt a 250-kilometer road on the western coast of Aceh which is still in use today. To keep the road safe for use, routine inspections are required by the relevant parties. Routine road condition checks are costly and resource intensive. Therefore, we need more efficient technology in terms of cost, effort and time in the road inspection process. Technological developments have enabled the use of smartphones to support various activities, including recording road condition data using an accelerometer sensor. The Dynamic Time Warping (DTW) method can be used as a method for checking road conditions by utilizing the results of the accelerometer sensor measurement, especially movement on the z-axis. In addition, the location of the coordinates of the anomaly can also be determined by utilizing GPS sensor data which is analyzed by the K-means clustering method. In this preliminary study, we apply the DTW method and K-means clustering in examining the USAID road surface condition. The data employed in this study are the results of the accelerometer sensor on the USAID road surface along about 15.56 kilometers from the location of SMAN 1 Lhoknga to Lhokseudu Beach which is divided into several segments based on the topography of the road surface (flat, downhill, and uphill). The results of the study show that the road topography of downhill and uphill sections have worse conditions than the topography of the flat road. The road segment with the worst conditions in this study was the downhill 2 section. The preliminary study indicates that the application of the DTW method in measuring road surface quality potentially will save time and energy, reduce costs, and be able to provide more accurate measurement results than conventional inspection methods.
Keywords: anomaly; dynamic time warping; usaid aceh road; road surface quality
2025 ISSUES
2024 ISSUES
LXII - April 2024LXIII - July 2024LXIV - November 2024Special 2024 Vol1Special 2024 Vol2Special 2024 Vol3Special 2024 Vol4
2023 ISSUES
LIX - April 2023LX - July 2023LXI - November 2023Special Issue 2023 Vol1Special Issue 2023 Vol2Special Issue 2023 Vol3
2022 ISSUES
LVI - April 2022LVII - July 2022LVIII - November 2022Special Issue 2022 Vol1Special Issue 2022 Vol2Special Issue 2022 Vol3Special Issue 2022 Vol4
2021 ISSUES
LIII - April 2021LIV - July 2021LV - November 2021Special Issue 2021 Vol1Special Issue 2021 Vol2Special Issue 2021 Vol3
2020 ISSUES
2019 ISSUES
Special Issue 2019 Vol1Special Issue 2019 Vol2Special Issue 2019 Vol3XLIX - November 2019XLVII - April 2019XLVIII - July 2019
2018 ISSUES
Special Issue 2018 Vol1Special Issue 2018 Vol2Special Issue 2018 Vol3XLIV - April 2018XLV - July 2018XLVI - November 2018
2017 ISSUES
Special Issue 2017 Vol1Special Issue 2017 Vol2Special Issue 2017 Vol3XLI - April 2017XLII - July 2017XLIII - November 2017
2016 ISSUES
Special Issue 2016 Vol1Special Issue 2016 Vol2Special Issue 2016 Vol3XL - November 2016XXXIX - July 2016XXXVIII - April 2016
2015 ISSUES
Special Issue 2015 Vol1Special Issue 2015 Vol2XXXV - April 2015XXXVI - July 2015XXXVII - November 2015
2014 ISSUES
Special Issue 2014 Vol1Special Issue 2014 Vol2Special Issue 2014 Vol3XXXII - April 2014XXXIII - July 2014XXXIV - November 2014
2013 ISSUES
2012 ISSUES
2011 ISSUES
2010 ISSUES
2009 ISSUES
2008 ISSUES
2007 ISSUES
2006 ISSUES
2005 ISSUES
2004 ISSUES
2003 ISSUES